Projects‎ > ‎

Integrated Power Supplies International, Inc.

Integrated Power Supplies International, Inc. has a rich history of working with NYS and many commercial customers. Below is a list of recently completed projects in the electrical construction and emergency back-up power fields:

NYS OPWD FLDDSO - Westfall Road Campus, Rochester, NY 12/20106
Emergency Repair of medium voltage infrastructure that failed on campus. 

NYSDOT - Canandaigua Transportation Facility, Canandaigua, NY 11/2016
Design and installation of a 100 kW generator with a 3-phase service rated 400 amp transfer switch.

NYS OPWD FLDDSO - 9 West Jefferson Extension IRA, Dansville, NY 1/2013
Installation of a 25 kW Generac Generator with a 400 Amp Service Disconnect and Transfer Switch

NYS OPWD FLDDSO - 29 Fiddler Road IRA, Mt. Morris, NY 1/2013
Installation of a 25 kW Generac Generator, 1000 gallon Propane Tank, and a 400 Amp Service Disconnect and Transfer Switch

NYS OPWD FLDDSO - 102 Cobblestone Terrace IRA, Newark, NY  7/2013
Installation of a 48 kW Generac Generator with a 400 Amp Service Disconnect and Transfer Switch

NYS OPWD FLDDSO - 32 Eagle Street IRA, Phelps, NY  7/2013
Installation of a 25 kW Generac Generator with a 400 Amp Service Disconnect and Transfer Switch

NYS OPWD FLDDSO - 3660 Walker Road IRA, Perry, NY 7/2013
Installation of a 25 kW Generac Generator with a 400 Amp Service Disconnect and Transfer Switch

NYS OPWD FLDDSO - 275 Telephone Road IRA, West Henrietta, NY 7/2014
Installation of a 25 kW Generac Generator with a 400 Amp Service Disconnect and Transfer Switch

Animal Hospital of Rochester - Rochester, NY 10/12
New 400 amp electrical service with complete building rewire.

Fireside Grill and Sports Bar - Henrietta, NY 9/13
New 400 amp electrical service with complete building rewire.
Comments